Turn unused space into livable square footage with professional basement finishing and attic conversions.
More Living Space
Add real square footage
Higher Home Value
Finished space pays you back
Dry & Comfortable
Waterproofing & insulation included
A finished basement is the cheapest square footage you will ever add — the structure already exists. Done right, it stops feeling like a basement at all: dry, warm, well-lit, with ceilings that hide the mechanicals and egress that keeps everyone safe and the space legal as a bedroom.
Basements are standard construction in Utah, Colorado, and Idaho, and we finish them complete: framing, insulation, electrical, plumbing for baths and kitchenettes, drywall, flooring, and trim — with moisture handled first, because nothing else matters if the space is not dry.
Framing through final paint — bedrooms, family rooms, and home offices.
Full and half baths with proper venting and drainage.
Code-compliant egress windows and wells that make bedrooms legal.
Drainage, sealing, and vapor control before finishes go in.
Plumbed and wired secondary kitchens for guests or rentals.
Turning attic space into finished rooms where structure allows.
Professional service and superior quality, every time.
Framing, drywall, flooring, and lighting for a complete space
Turn attic space into bedrooms, offices, or bonus rooms
Moisture control and drainage that protect your investment
Egress windows and code-compliant construction
Plumbing rough-ins for full downstairs living
Transparent pricing with no hidden fees
Yes — finished below-grade space consistently returns a strong share of its cost at resale in our markets, and it is dramatically cheaper per square foot than building an addition. A legal bedroom with egress adds the most.
An egress window (or door) of code-required size with a proper well, plus minimum ceiling height and a smoke detector. We install egress windows as part of finishing so the bedroom counts — for safety and for resale.
We address moisture before finishing, not after: grading and gutter issues outside, sealing and drainage inside, and vapor-smart insulation. Finishing over a damp basement is how you buy mold, so we simply will not do it.
A typical full finish runs six to ten weeks depending on size and whether a bathroom is included, with inspections at rough-in and final. You get the schedule in writing with your quote.
Planning a project? Read our home improvement guides or schedule a free estimate.
Join thousands of homeowners who transformed their spaces